home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V13_4 / V13_475.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  19KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from hogtown.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/8c6aEA600WBwA8R059>;
  5.           Sun, 28 Apr 91 01:56:28 -0400 (EDT)
  6. Message-ID: <oc6aE6200WBwI8PE4r@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Sun, 28 Apr 91 01:56:22 -0400 (EDT)
  12. Subject: SPACE Digest V13 #475
  13.  
  14. SPACE Digest                                     Volume 13 : Issue 475
  15.  
  16. Today's Topics:
  17.                Galileo Solution
  18.        Re: Why does every SAR have another resolution?
  19.           Re: Energia (was Re: Saturn V blueprints)
  20.                Re: Saturn V and the ALS
  21.            Re: Launch Scrubs due to Weather
  22.         Re: Alexander Abian wants to blow up the moon?
  23.              Re: Saturn V vs. ALS
  24.              Re: Galileo Solution
  25.      Re: slight problems with HLV's in general, Saturn or not...
  26.        Re: Shuttle Reliability (was: Re: Saturn V and the ALS)
  27.  
  28. Administrivia:
  29.  
  30.     Submissions to the SPACE Digest/sci.space should be mailed to
  31.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  32.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  33.              tm2b+@andrew.cmu.edu
  34.  
  35. ----------------------------------------------------------------------
  36.  
  37. Date: 27 Apr 91 20:51:15 GMT
  38. From: usc!cs.utexas.edu!uwm.edu!ux1.cso.uiuc.edu!pequod.cso.uiuc.edu!ahiggins@apple.com  (Andrew Higgins)
  39. Subject: Galileo Solution
  40.  
  41. CNN reported this morning that JPL is recommending launching a
  42. communications satellite to Jupiter to act as a relay for the
  43. malfunctioned Galileo spacecraft.  A brillant solution, IMHO.
  44. --
  45.     Andrew J. Higgins
  46.     ahiggins@pequod.cso.uiuc.edu
  47.  
  48. ------------------------------
  49.  
  50. Date: 27 Apr 91 12:05:43 GMT
  51. From: nitrex!rbl@uunet.uu.net  ( Dr. Robin Lake )
  52. Subject: Re: Why does every SAR have another resolution?
  53.  
  54. In article <1923@mpirbn.mpifr-bonn.mpg.de> p515dfi@mpirbn.UUCP (Daniel Fischer) writes:
  55. |>From NASA NEWS RELEASE 91-34 of February 27, 1991 on the RADARSAT spacecraft:
  56. |>> The satellite's synthetic aperture radar (SAR) will be ... scanning the
  57. |>> Earth in swaths varying from 50 to 500 km. The SAR will produce high-resolu=
  58. |>> tion (10 to 100 meters pixel size) images of the Earth's surface...
  59. |>
  60. |>Now we all know that the Magellan in its orbit around Venus produces swaths
  61. |>some 25km wide, with a resolution of approx. 120 meters. Why can the resolution
  62. |>of RADARSAT's SAR be so much better, about a factor of 10? This can't be due
  63. |>to a lower orbit alone, I presume. Also, why can RADARSAT have many more 
  64. |>pixels across the swath's width (according to this article 5000) compared to
  65. |>Magellan (200)? Does that depend on their antennas or on the data processing?
  66. |>
  67. |>Furthermore, there are rumors that the Lacrosse satellite's SAR can resolve
  68. |>features down to 1 meter in size (how official is that?).
  69.  
  70.  
  71. As I recall from last year's excellent short course at UCLA:
  72.  
  73.     The along-path resolution of SAR depends (in part) upon velocity
  74. of the craft.  Lateral resolution depends upon bandwidth of the pulse.
  75. (Sorry, my notes are at the office!)
  76.  
  77.     NASA/JPL have several excellent publications which include details
  78. on SAR satellite resolutions.
  79.  
  80. Rob Lake
  81. lake@rcwcl1.dnet.bp.com
  82.  
  83. ------------------------------
  84.  
  85. Date: 27 Apr 91 00:28:02 GMT
  86. From: hub.ucsb.edu!ucsbuxa!3001crad@ucsd.edu  (Charles Frank Radley)
  87. Subject: Re: Energia (was Re: Saturn V blueprints)
  88.  
  89. In article <920@idacrd.UUCP> mac@idacrd.UUCP (Robert McGwier) writes:
  90.  
  91.  No, my original post was correct as written, read it again.
  92. The launches you refer to are not paid for by the US government.
  93. They are private commercial luaunches paid for by o private
  94. companies.
  95.   The US Government does not purchase foreign launch vehicles,
  96. and never has.
  97.    There are no signs this policy will change in the forseeable
  98. future.
  99.  
  100. >From article <10797@hub.ucsb.edu>, by 3001crad@ucsbuxa.ucsb.edu (Charles Frank Radley):
  101. >> 
  102. >> 
  103. >> Federal law prohibits The Us Government ( including NASA ) 
  104. >> from purchasing launches on foreign launch vehicles.
  105.  
  106.  
  107. >You are incorrect.  There will be US built satellites launched on Long March's
  108. >sometime in the near future and there are now DOZENS of launches on
  109. >Arianes.  I have PERSONALLY built satellites in the US that were launched
  110. >on Ariane.
  111.  
  112. >How's about checking your facts before making false flat statements.
  113.  
  114. >Bob
  115.  
  116. >-- 
  117. >____________________________________________________________________________
  118. >    My opinions are my own no matter    |    Robert W. McGwier, N4HY
  119. >    who I work for! ;-)            |    CCR, AMSAT, etc.
  120. >----------------------------------------------------------------------------
  121.  
  122. ------------------------------
  123.  
  124. Date: 28 Apr 91 02:04:03 GMT
  125. From: mnemosyne.cs.du.edu!isis!gaserre@uunet.uu.net  (Glenn A. Serre)
  126. Subject: Re: Saturn V and the ALS
  127.  
  128. In article <1991Apr26.185202.7077@en.ecn.purdue.edu> irvine@en.ecn.purdue.edu (/dev/null) writes:
  129.  
  130. [Brent says F-1s need to be improved, Henry says they work fine]
  131.  
  132.    The engines do NOT work fine if they help contribute to $1500+/lb to
  133.    orbit (optimistic estimate).  I suggested lowering the amount of fuel
  134.    NOT because kerosene is expensive (it's not), but to open up
  135.    more VOLUME and LIFT for payload, thus dropping costs! 
  136.  
  137. Lowering the "amount of fuel" (I assume you mean raising Isp) will not 
  138. neccessarily reduce costs.  To raise Isp in an F-1, one would: 
  139. 1) Raise the chamber pressure (the F-1 operates at low altitude, so there's
  140. a limit as to how much a larger nozzle would raise Isp.  
  141. 2) Raise the chamber temperature.  
  142. 3) Use more powerful turbines (more RPM's, larger blades, whatever).  
  143. 4) Because of 1) redesign the engine structure to accomodate higher loads.
  144. 5) Because of 2) redesign the cooling system, deal with the problem of "coking"
  145. (sp?) in the RP-1 which is used as coolant (Thanks, Henry, for telling me what 
  146. that effect is called.)
  147. 6) Because of 3) increase the tolerances on the turbine assemblies, use higher
  148. strength materials, whatever.  
  149. etc. etc.  
  150.  
  151. The point is, making something "better" doesn't mean making it cheaper.  
  152. If you think that the main goal of ALS is to make launches cheaper, then why
  153. isn't ALS going to at least experiment with BDBs?
  154.  
  155.    the payload SIZE is wonderful (though it could be better :) ),
  156.     its COST is terrible.  We need to get
  157.  
  158. But MUCH better than what we have now.  
  159.  
  160.    cost per pound down below $1000/lb (preferably $200/lb).
  161.  
  162. You mean like the Shuttle (another advanced lanch system)?
  163.  
  164.    You missed my whole point.  The Saturn V is too expensive as it iS!
  165.    We neeD launcher that gives us a large payload AND cost less than $1000/lb or
  166.    there will never be a use for it or any other "heavy launcher!"
  167.  
  168. It is highly unlikely that this cheap launcher will be ALS (the name itself
  169. is an indication).  
  170.  
  171. Oh, well.  More incoherent ramblings...
  172.  
  173. --
  174. --Glenn Serre         |Soon-to-be former Payload Integration Engineer for 
  175. gaserre@nyx.cs.du.edu |Martin Marietta Astronautics Group, Space Launch Systems
  176.                       |Company.  
  177.                       |Next job:  Script writer for Cayenne Systems, Inc.
  178.  
  179. ------------------------------
  180.  
  181. Date: 27 Apr 91 16:09:35 GMT
  182. From: usc!samsung!spool.mu.edu!cs.umn.edu!kksys!wd0gol!newave!john@apple.com  (John A. Weeks III)
  183. Subject: Re: Launch Scrubs due to Weather
  184.  
  185. In article <1991Apr26.152236.11376@herbert.uucp> doug@rsl-egg.com (Doug Phillipson ) writes:
  186. > Has anyone got some stats concerning what percentage
  187. > of shuttle launches were scrubbed due to weather from KSC?
  188.  
  189. There's something else the Saturn V did not have to worry about,
  190. based on the Apollo 12 flight 8-).
  191.  
  192. > Can anyone tell me how much of an advantage it is, in payload pounds,
  193. > to launch from KSC as opposed to say Nevada.  The weather in Southern Nevada
  194. > is such that launches could take place 300 plus days a year.  There is
  195. > lots of open land for launch failures to fall into. The humidity is usually
  196. > below 20 percent and it is not a wildlife refuge (I understand that launches
  197. > are not allowed sometimes when they might disturb the hatching of protected
  198. > birds).
  199.  
  200. The big disadvantage of KSC is the salt water.  Things corrode like mad
  201. near the ocean.  One of the space magazines recently had pictures of the
  202. Gemanii pad--it is almost rotted away.
  203.  
  204. Although a drive through Nevada might give you the impression of lots of
  205. open land, there is still not enough empty space to safely launch rockets.
  206. Birds are launched from KSC at angles of up to 57 degrees that I recall.
  207. This would put a large part of the USA under the path of a failure.
  208.  
  209. Now consider logistics.  Where would the SRB's fall?  Some vehicle 
  210. components are shipped by barge--would you dig a canal?  Shuttle launches
  211. require a large quantity of water on the pad--where would you get a large
  212. amount of water in the desert?  Actually, these points assume the current
  213. shuttle design.  I suppose one could argue that, given Nevada as a launch
  214. site, the shuttle design would be different.
  215.  
  216. At KSC, the shuttle can ride out any storm except a hurricane (I'm unsure
  217. what a hail storm would do).  In Nevada, how would a sand storm affect
  218. the shuttle?  I suspect that a sand storm would seriously contaminate
  219. the shuttle.
  220.  
  221. -john-
  222.  
  223. -- 
  224. =============================================================================
  225. John A. Weeks III               (612) 942-6969             john@newave.mn.org
  226. NeWave Communications                       ...uunet!tcnet!wd0gol!newave!john
  227.  
  228. ------------------------------
  229.  
  230. Date: 26 Apr 91 23:37:42 GMT
  231. From: prism!ccoprmd@gatech.edu  (Matthew DeLuca)
  232. Subject: Re: Alexander Abian wants to blow up the moon?
  233.  
  234. In article <1991Apr26.213135.16041@midway.uchicago.edu> esti@ellis.uchicago.edu (Paul A. Estin) writes:
  235.  
  236. >    Very late last night (around 4 or 5 AM) I tuned in to CBS's
  237. >"Nightwatch" news program in the middle of a "debate" between Bevan
  238. >French of NASA and some crazy loon at Iowa State University named
  239. >Alexander Abian.
  240. >    My question is basically... who IS this Abian guy and what
  241. >exactly is he trying to say?
  242.  
  243. While standing in the checkout line last month with my bag of Doritos, 
  244. waiting for the cashier to figure out the price on a bar of soap for the 
  245. customer in front of me, I had the good luck to spy a copy of the Weekly
  246. World News, with the headline 'SCIENTIST WANTS TO BLOW UP MOON!' in type
  247. large enough to announce the advent of World War III.
  248.  
  249. Basically, this guy wants to blow up the moon in such a manner as to 
  250. have a large chunk drop into the Pacific, thereby knocking the planet
  251. into a 0 degree (as opposed to the current 23.45 degree) axial tilt, 
  252. making it springtime forever over a large chunk of the earth and bringing
  253. happiness to all.  How he plans to do this wasn't made clear.
  254.  
  255. There weren't any sidebars or graphs, though, so I discounted the article
  256. entirely. :-)
  257.  
  258. -- 
  259. Matthew DeLuca                   
  260. Georgia Institute of Technology      "I'd hire the Dorsai, if I knew their
  261. Office of Information Technology      P.O. box."  - Zebadiah Carter,
  262. Internet: ccoprmd@prism.gatech.edu    _The Number of the Beast_
  263.  
  264. ------------------------------
  265.  
  266. Date: 27 Apr 91 03:29:48 GMT
  267. From: agate!lightning.Berkeley.EDU!fcrary@ucbvax.Berkeley.EDU  (Frank Crary)
  268. Subject: Re: Saturn V vs. ALS
  269.  
  270. In article <1991Apr26.153503.27220@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  271. >In article <1991Apr26.064504.7058@agate.berkeley.edu> fcrary@lightning.Berkeley.EDU (Frank Crary) writes:
  272. >>Not at all. If someone thinks a market is possible, they will invest in
  273. >>the infrastructure....
  274. >
  275. >Oh really?  Who?  Especially in the US, where the Next Quarter's Bottom Line
  276. >is God?  People invest because they are *sure* there is a market, not because
  277. >they think there might be one or they think one might develop eventually.
  278. If the US does not invest, then Japan or the EC nations will. They have
  279. been known the invest in projects which did not show a profit for five
  280. or more years.
  281. However US companies CAN make long term investments. Orbital Sciences 
  282. Corporation has yet to make a cent on the Pegasus launcher, unless
  283. you count advanced money for launch contracts. Their vehicile will not 
  284. start making for-profit launches untill (if I remember correctly) later
  285. this year. It has been in development for over four years. Is this not
  286. a long term investment in space infrastructure by a US company, who
  287. thinks there is a market?
  288.  
  289.                         Frank Crary
  290.                         UC Berkeley
  291.  
  292. ------------------------------
  293.  
  294. Date: 27 Apr 91 22:35:34 GMT
  295. From: prism!ccoprmd@gatech.edu  (Matthew DeLuca)
  296. Subject: Re: Galileo Solution
  297.  
  298. In article <1991Apr27.221502.21264@cs.rochester.edu> dietz@cs.rochester.edu (Paul Dietz) writes:
  299.  
  300. >"Brilliant" is not the word that springs to my mind.  "Desperate"
  301. >seems more applicable.  Perhaps I am cynical, but I doubt NASA
  302. >can or will build a new RTG powered comsat from scratch in time
  303. >(do they even have enough Pu-238 on hand?).
  304.  
  305. Well, the actual Jupiter encounter isn't until 1996; they have five years
  306. (assuming they can't get the antenna opened up correctly) to build a relay 
  307. sat and get it out there.  If they make it small enough, they should be 
  308. able to get it onto a Titan and on to a two-year route (the same one the 
  309. Voyagers and Pioneers took) to Jupiter.  They've got three years...I'm 
  310. pretty confident that with the importance of this project, they can whip 
  311. something up and get it out there; remember, these guys (at JPL) can do 
  312. anything. :-)
  313.  
  314. >Perhaps a more sensible approach would be to jettison the reentry
  315. >probe, change the second gravity assist and salvage some science by
  316. >abandoning Jupiter and converting to a multiple asteroid flyby
  317. >mission.  It could repeatedly swing by earth and/or mars to be
  318. >directed onto flybys of new asteroids.  With luck, we could get
  319. >pictures of half a dozen or so, with the data from each encounter
  320. >played back over the low gain antenna at the next flyby of earth.
  321.  
  322. I dunno about this one.  Getting a look at the atmospheric composition
  323. of Jupiter from the 'top' of the atmosphere on down to where the probe
  324. stops transmitting would seem (to me) to be worth a *lot* more than 
  325. a few extra asteroid encounters, especially considering that the original
  326. encounters can still be done.  Not to mention, the extra detail (as compared
  327. to Voyager) we can get on the moons of Jupiter is worth a lot, especially
  328. for Io and Europa.  Dropping all this for a few measly asteroids seems to 
  329. be a waste.
  330. -- 
  331. Matthew DeLuca                   
  332. Georgia Institute of Technology      "I'd hire the Dorsai, if I knew their
  333. Office of Information Technology      P.O. box."  - Zebadiah Carter,
  334. Internet: ccoprmd@prism.gatech.edu    _The Number of the Beast_
  335.  
  336. ------------------------------
  337.  
  338. Date: 27 Apr 91 03:15:33 GMT
  339. From: pasteur!agate!lightning.Berkeley.EDU!fcrary@ucbvax.Berkeley.EDU  (Frank Crary)
  340. Subject: Re: slight problems with HLV's in general, Saturn or not...
  341.  
  342. In article <DLBRES10.91Apr26102812@pc.usl.edu> dlbres10@pc.usl.edu (Fraering Philip) writes:
  343. >2. I believe that on-orbit assembly will be much easier than you seem
  344. >to believe.
  345. The Soviet Union (or more correctly the Energia NPO, which operates the 
  346. Mir space station) offered to have kosmonauts do work in orbit for
  347. $1,000,000/hour. This was in relation to baby-sitting a Japanese reporter.
  348. They also said they would charge a similar rate for any experiment which
  349. required the kosmonauts time. EVA (spacewalk) time would, they said, cost
  350. more. Such EVA work would be needed to do on-orbit assembly.
  351.  
  352. The assembly of the international station, Freedom, will require
  353. 17 shuttle flights with intensive EVA schedules to assemble from 5 to 20 
  354. tonne elements. Assuming 5, 2-man, 5-hour EVAs/flight (a low number) this
  355. would be 850 man-hours of EVA. At the soviet's rates this would cost
  356. 850 million dollars.
  357.  
  358. Soviet cost quotes may or may not be meaningful. 
  359.  
  360.                                       Frank Crary
  361.                       UC Berkeley
  362.  
  363. ------------------------------
  364.  
  365. Date: 26 Apr 91 22:00:27 GMT
  366. From: hela!aws@uunet.uu.net  (Allen W. Sherzer)
  367. Subject: Re: Shuttle Reliability (was: Re: Saturn V and the ALS)
  368.  
  369. In article <dkwg87-@rpi.edu> mvk@aix01.aix.rpi.edu (Michael V. Kent) writes:
  370.  
  371. >>There is a good graph of this in the November 12,1990 Avation Week on page
  372. >>27. It shows Shuttle actual flights vs flights on the manifest for the past
  373. >>ten years. The first manifest had the 55th flight happening around the end
  374. >>of 83. Eight and a half years later we have had less than 40 flights. Even
  375. >>manifests made as recently as the Fall of 89 are off by a factor of two.
  376.  
  377. >Aye, but there is more to the story than that.  These predictions of 50 flights
  378. >a year were with a fleet of 6 oribiters, not 3....
  379.  
  380. This is not relevant. The manifests I am refering to where made starting
  381. less than a year from the first flight to the end of 89. At that time
  382. NASA knew how many orbiters there would be and all that. For ten years
  383. dispite all the experience to the contrary they where still predicting
  384. twice as many flights as they could deliver. Just look at the graph and
  385. you will see what I mean.
  386.  
  387. I don't doubt that manifests would be off in the first few years but
  388. for ten years they have had little relation to reality.
  389.  
  390. >Going back to another AvWeek article, this one in the late '87 / early '88
  391. >era, we will find NASA complaining that they are short 500 personnel to
  392. >work on the Return to Flight.  They predicted that this Congressionally 
  393. >mandated hiring freeze would push Return to Flight back 3 to 6 months, and
  394. >that Columbia would probably be delayed until 1989.
  395.  
  396. Even granting that it wouldn't have made any difference. All it would have
  397. done is add even more cost to what is not the most expensive way to put a
  398. pound in orbit.
  399.  
  400. >NASA has been addressing the lower flight rate.  They have increased Discovery
  401. >and Atlantis from 25 to 50 man-day flight-capability, and Columbia to 75 man-
  402. >days.  Columbia is about to undergo further modifications to extend that to
  403. >110, with a possible further increase to 200 in the man-tended Space Station
  404. >era.  Endeavour weighs in at 75 man-day capable, with possible increases to
  405. >the 200 man-day level.
  406.  
  407. Won't be enough. Even if we give the Shuttle all the breaks on assigning
  408. cost they still got to fly 20+ times a year to be priced reasonably. That's
  409. three times the current (inflated) manifest.
  410.  
  411.  
  412.    Allen
  413.  
  414. -- 
  415. +-----------------------------------------------------------------------------+
  416. |Allen W. Sherzer | If you love something, let it go. If it doesn't come back |
  417. |   aws@iti.org   | to you, hunt it down and kill it.                         |
  418. +-----------------------------------------------------------------------------+
  419.  
  420. ------------------------------
  421.  
  422. End of SPACE Digest V13 #475
  423. *******************
  424.